关闭

澳际学费在线支付平台

2月GMAT作文机经:Factory drill bits.

刚刚更新 编辑: 浏览次数:214 移动端

  GMAT作文机经能够指引人们在作文的道路上不再迷茫,这不2月GMAT作文机经就来为你指明道路,澳际小编就在这寒冬中为大家吹来一股GMAT机经的暖风,为大家分享GMAT作文机经,希望大家能感受到这股暖意,并把它化为能量,在GMAT考试的道路上勇往直前。

  【原始】

  V1 是说一个factory drill bits 比这家公司其他的factory产率要高,所以要把这个factory变成完全生产drill bits的,然后把非drill的设备搬到其他公司去,这样才能降低production cost 我觉得我在题库里做过 可是记不得当时的分析了 考试时候现想 感觉还是比较简单. (by: isabella5858)

  V2 (原题! 感谢miumiusha提供)Our factory in Cookville is our most advanced and ficient. It is capable of producing ten drill bits for each dollar of production costs, whereas none of our other factories can produce more than seven drill bits per dollar of production costs. Therore, we can reduce our overall drill bit production costs by devoting the Cookville factory entirely to drill bit production. Since reducing the production costs of individual machine parts is the only way to achieve our larger goal of reducing our overall production costs, dedicating the Cookville factory entirely to drill bit production and shifting all other machine part production to our other factories will help us to attain that larger goal

  攻击点:

  1. 搬迁Cookville factory其他产品的生产设备到其他厂需要一道笔费用,而且Cookville factory还有要买生产drill bits的设备,培训员工等等,这些费用导致了drill bits的production cost增加;

  2. Cookville factory非drill bits的生产线的效率也比其他factory高 , devoting the Cookville factory entirely to drill bit production导致非drill bits 的production costs增加;

  3. reducing the production costs of individual machine parts的最好方法不是devoting the Cookville factory entirely to drill bit production,而是努力提高其他的factory的生产效率;

  以上就是关于GMAT机经的全部内容,考生朋友可以有选择的看看,最后需要提醒各位的是,GMAT机经虽然会对我们解题有所帮助,但是在考场中即使题目很像也要避免秒选,最后祝大家都能考出好成绩。

  • 澳际QQ群:610247479
  • 澳际QQ群:445186879
  • 澳际QQ群:414525537